The steps of feeding the coil feed line.

1. After the test coil feed line is installed, first open the leveling roller and raise the folding arm.

2. Adjust the spacing of the guide rollers at the inlet of the three-in-one feeder according to the material, and the spacing should be wider than the width of the passing material.

3. After the front section is completely adjusted, press down on the leveling head roller. Then switch the running mode of the spindle from manual running mode to automatic running mode.

4.When the material enters, press the leveling roller to the appropriate position, and adjust the distance between the guide rollers of the entrance width again, so that the width exactly matches the width of the material, so that the material can enter smoothly.

5.Finally, put down the material support arm of the material rack, press the forward rotation button of the main shaft to form the material ring, and then adjust the handwheel to the appropriate position.

The above steps can be adjusted according to the actual situation, and we have already set them according to the material size requirements in the process of preparing for production. Therefore, after purchasing, you can rest assured to produce after the equipment arrives at the place of use.