Perforated Components
This guide separates the real material or manufacturing requirement from standard servo-feeder functions, then identifies the data and validation needed for a reliable line.
What the Evidence Supports
This page separates the real material or manufacturing topic from capabilities that have not been demonstrated for a HENLI servo feeder.
- Perforated metal uses defined hole shapes, pitch and open-area patterns.
- Feed accuracy, hole placement, part tolerance and acoustic performance are separate responsibilities that require separate verification.
- No 1000-SPM, 60 m/min, 70% downtime or acoustic-optimized motion evidence was found.


Evidence Required for Special Claims
The application name alone does not prove a special machine capability. Treat each claim as project-specific and record the evidence used for quotation and acceptance.
- Machine specification: identify the exact model, component ratings, environmental limits and approved material envelope.
- Performance: state the test material, feed pitch, cycle rate, sample size, measurement method and acceptance tolerance.
- Certification or compatibility: identify the applicable standard, scope, configuration and supporting report instead of relying on a general label.
What the Servo Feeder Controls—and What It Does Not
| Engineering area | Feeder or line action | Boundary |
|---|---|---|
| Feed pitch | The feeder indexes the strip by the programmed distance. | Actual station-to-station registration includes slip and pilot correction. |
| Hole geometry | The feeder presents material to the die. | Punch, die, clearance and wear determine the hole. |
| Pattern position | Feed and pilot strategy influence row-to-row location. | Tool construction and press deflection also matter. |
| Acoustic result | Consistent manufacturing supports a stable product. | Open area, material, geometry and acoustic design belong to the product specification. |
Application Data to Verify Before Quotation
Use measured production data and material documentation. A feeder model should not be selected from the application name alone.
- List every critical characteristic: hole diameter, pitch, pattern location, open area and part outline.
- Assign each characteristic to feeder, die, press, material or downstream process.
- Define the measurement method and sampling plan.
- Confirm strip thickness, strength, width and lubrication.
- Check pitch and acceleration at required SPM.
- Inspect both first-off and sustained-production parts for drift and tool wear.
Recommended Engineering Workflow
1. Build a tolerance map
Do not use one ±0.1 mm value for unrelated features.
2. Design registration
Coordinate feeder index, pilots and die sequence.
3. Prove the press window
Verify the commanded move fits between signals at target speed.
4. Measure capability
Use production data for feed pitch, holes, pattern and part separately.
Frequently Asked Questions
Does the feeder punch acoustic holes?
No. The press and die create the perforations.
Can HENLI guarantee ±0.1 mm?
Only for a clearly defined characteristic under an agreed machine, material, die and test condition.
What should be included in the RFQ?
Material data, hole and pattern drawing, feed progression, SPM, die pilots, part tolerances and inspection method.
Technical References
These sources support the material, process or component boundary discussed above. They do not certify a HENLI machine unless an HENLI-specific test or certificate is explicitly identified.
- ISO 7805-1 overview of perforated plate patterns and pitch-to-hole ratios
- HENLI feed pitch selection guide
Related HENLI Resources
Acceptance ChecklistDefine measurable feeder and press-interface evidence.
NC Servo Feeder ModelsCompare machine ranges after the tolerance map is complete.
Define the Application Before Selecting a Feeder
Send the material standard and condition, width and thickness range, feed pitch, target strokes per minute, press and die details, surface requirements, line layout and the acceptance method. HENLI can review the standard feeder scope and identify any special engineering that still requires validation.