Heavy-duty double-head project route

Hydraulic Double Head Decoiler for Heavy Steel Coil Changeover

HENLI configures hydraulic double head decoilers for steel coil and steel strip lines that need two loading positions, heavy-coil handling and faster changeover. This is the commercial owner for hydraulic or heavy-duty double-head enquiries; frame, spindle, expansion, drive, support and loading are engineered from project data.

Two coil positionsActive and prepared sides by confirmed sequence
Hydraulic optionsExpansion and handling selected by project
Custom capabilityUp to 10T per side / 20T total after engineering confirmation
double head decoiler with two spindle positions for steel coil changeover
Double-head architecture; heavy expansion, support and loading details are project-configured.

Terminology and boundary

What โ€œHydraulic Double Head Decoilerโ€ Means

Double head, two-head, dual-spindle and double-spindle describe two coil positions. โ€œHydraulicโ€ normally describes mandrel expansion and/or a configured loading or support function; it does not by itself define payoff drive, speed control, braking or downstream synchronization.

Motorized route

Use approved powered payoff and loop control when the line needs active unwinding.

Pull-off route

Consider only when the downstream machine can pull the strip and the brake/control design fits coil inertia.

Hydraulic handling

Hydraulic expanding mandrels, supports and loading aids are selected from I.D./O.D., mass, width, center height and site handling.

Standard and custom

Capacity Is Defined Per Side and for the Complete Assembly

The standard MTD table and HENLI's confirmed custom manufacturing capability are different layers. A standard table is a reference, not the ceiling of non-standard engineering capability.

LayerPublished/confirmed routeHow to use it
Regular MTD reference500 kg ร—2, 800 kg ร—2 and 1200 kg ร—2 model routesUse the Double Head owner for current standard tables.
Custom heavy-duty manufacturingSingle-side projects up to 10T and double-side total up to 20TRequires engineered frame, spindle, bearings, support, locking, loading, floor/foundation and acceptance.
Speed and responseProject-specificConfirm inertia, drive/brake, buffer, sensors, downstream cycle and tests; capacity does not prove speed.
Important: 5T or 10T per side is not created by changing a standard-table number. The approved design states the load definition, coil envelope, active/idle condition and verification method.

Engineering checklist

Heavy Double-Head Design Requires More Than Hydraulic Expansion

Frame and spindle

  • Per-side and combined load cases
  • Mandrel, shaft, bearings and support
  • Rotation and positive positioning

Loading and restraint

  • Crane, forklift or coil car
  • Pressing/retaining arm as required
  • Idle-side loading clearance

Controls and interfaces

  • Motorized or pull-off logic
  • Loop sensing, braking and stops
  • Straightener, feeder and press interlocks

Changeover route

Offline Coil Preparation Can Reduce Coil-Change Downtime

When the idle side can be prepared while the active side runs, the double-head arrangement supports a zero-downtime coil-changeover sequence and can reduce coil-change downtime by up to 90% in a confirmed line configuration. This applies to the coil-change stepโ€”not total production downtimeโ€”and depends on loading, positioning, strip joining/threading and safety.

Prepare

Load, center, expand and restrain the next approved coil on the idle side.

Stop and secure

Follow the verified stop, isolation, end-of-coil and positioning sequence.

Change and restart

Select the prepared side, complete approved threading/joining and restart after line checks.

Quotation checklist

Data Needed for a Hydraulic Double Head Decoiler Quote

Coil and material

  • Material/strength and surface
  • Per-coil weight, width and thickness
  • I.D., O.D. and coil direction

Line and changeover

  • Speed, buffer and downstream cycle
  • Changeover sequence and target
  • Motorized or pull-off preference

Site and handling

  • Crane, forklift or coil car
  • Foundation, space and clearance
  • Electrical/hydraulic standard

FAQ

Heavy-Duty Hydraulic Double Head Decoiler Questions

Can HENLI build 10T on each side?

Yes. HENLI has confirmed custom manufacturing capability up to 10T per side and 20T total, subject to engineered coil envelope, structure, loading, floor/foundation and acceptance scope.

Does hydraulic expansion mean motorized payoff?

No. Hydraulic expansion grips/releases the coil I.D.; a separate drive decision determines motorized payoff.

Can it process stainless steel or aluminum?

Potentially, after strength, surface sensitivity, thickness-width combination, coil mass, edge condition and downstream process are confirmed.

Is zero-downtime changeover automatic on every line?

No. It is a confirmed capability when offline loading and the complete switching/threading sequence are designed and verified.

Define the Load Per Side Before Quotation

Send both coil positions, the active/idle loading condition and complete line cycle.

Request a Heavy Double-Head Review